Rio Vista Elementary Pedestrian Connection

Project Information


Project No.:  0662-6R4141
State Project No.: ATPL-5928(139)

Project Description:  The work to be done generally consists of installation of approximately 525 linear feet of 5-ft wide sidewalk, curb and gutter, driveways, driveway conforms, storm drain improvements, an endwall, and pavement widening for a 5 foot wide bike lane on the north side of Pacifica Avenue, from Mariners Cove Drive to 525 feet west. A set of rectangular rapid flash beacons will be placed at the school crossing, and a speed feedback sign will be placed 150-feet west of the Wharf Drive. 

General Location: Community of Bay Point, CA                
Supervisory District: # 5
Thomas Brothers Map Reference:  Page 573/C1         
Contractor: Hess Concrete Construction Co., Inc     
Project Engineer: Tuanjun Cao          
Phone: (925) 313-2110           
Start Date: June 11, 2018         
Estimated Completion Date: August 6, 2018
Funding Source: ATP
   

Project Links